1. Transport
  Load selection of a suitable, and the machine can match the flatbed truck for transport. On the truck, horizontal cylinder four legs up high, vertical cylinder four legs contraction increased preference climbing rack, attention to the steady climb rack, and then contracted transverse four legs tank into the flatbed truck, the machine is located on top of the flatbed truck transport.

2. Unloading and assembly?
  Machine arrived at the construction site, the choice of suitable flat, solid terrain, climbing rack filled STICKING tank cars can be driven away, and then on the rack section of the car into the machine and the next section of a solid link may be erected rack, can be connected to the fuel tank.

3. Static pile construction
  Pressure piles in the pre-construction should be based on the diameter of the pile, accompanied by mold and pile caps make it to a matching. Under pressure to pile on the pressure piling equipment installed on the counterweight, the pressure will pile construction.

4. Hydraulic table conversion
  Construction of pressure manometer is not in the case of damage, according to the conversion tables conversion, various useless without bureaucratic determination to bring the construction of unnecessary troubles. Hydrostatic pressure value is not equal to pile capacity, and its sliding friction is much less than the actual use of the static friction. bearing capacity, static load test could not be ascertained.

5. Important parts operation and to use items
  (1). the start of each pump, the fuel tank should check the adequacy of the oil deposit, If oil level below the ceiling of oil standard should first refueling, it will cause decorative suction pump air burn. pre-installed pumps leaking pipe filled oil.

  (2). the pump before the start, should the manual valve home middle of the pack, the system in the middle of the range unloading state Then move the remotely activated (observation motor rotation direction and cast fan in the direction of the arrow line. If reverse rotation should be adjusted), repeated several times until all the normal vibration and noise before the official launch.

  (3). the system has safety relief valve protection. System security pressure in the factory before the scheduled transfer. Users in the course of professionals should be based on the rated working pressure to set the operation.

  (4). the system through the manual valve control hydraulic cylinder jacking or retraction, roughly the same time can adjust the hydraulic cylinder speed played a buffer role in the beginning to push for (pull) not to handle a push (pull) in place, should gradually push-pull can play a hydraulic cylinder loading buffer.

   (5). outrigger cylinder hydraulic lock with a one-way, the pressure can be maintained.

6. Important parts of maintenance and repair
  (1). before and after turning off the electrical power supply kerosene or diesel system will scrub clean. then dry with a soft cloth.

   (2). the work of the system on the quality of # 20, # 30 hydraulic oil, the # 30 summer and winter festival with # 20, oil to the fuel tank through the filter tip to be regularly cleaned and replaced with new oil tank (under normal circumstances each work 500 hours or Oil changes for a period of three months and found that the oil emulsion metamorphism occurred or too many impurities to be ready)

  (3). in order to guarantee the cleanliness of the hydraulic system, the initial system should work 150 hours cleaning oil return oil filter, Under normal circumstances each work 2,000 hours cleaning time, the public has to be cleaned at any time.

  (4). the Common Cause analysis and excluded (see table)

  (5). pieces of vulnerability in the factory with a set of random, if necessary, to purchase the Company.

7. Troubleshooting

No.

Fault

Possible causes

Remove ?

1

Unmoral vibration and noise when lifting

1. inclusion of air in hydraulic cylinder

1.exhaust the air

2. the mechanical structure tight

2. adjust or replace ?

2

Hydraumatic cylinder decline when loading

1.the hydraulic lock not work

1. adjust or replace

2.hydraulic cylinder leakage

2. adjust or replace the sealing parts

3. oil leakage in joint parts

3. check and adjust

3

Lifting slow

1. worn parts of oil pump or counter heating oil disc block

1.check the oil pump

2. reversing valve leakage( not to the right spot)

2. adjust or replace

3. hydraulic cylinder leakage

3. adjust or replace the sealing part

4. hydraulic pipe leakage

4. check and remove

4

Powerless or unable to lift

1. low oil level

1. feed oil

2.low pump efficiency

2. adjust or replace

3.the valve spool seized or dirt in overflow valve

3. clean or replacement

4. manual reversing valve leakage

4. adjust or replace

5. oil Filter block

5. clean or replace

6.oil pipeline leakage

6.adjust or replace

 

 
 
 
 